First, the distributor's building. A major distributed building was built with medium voltage (22 K). f) It contains 9 medium voltage cells to feed the project with one loop. Second: Transformer rooms/Four transformer rooms have been established. Two transformer rooms containing 2 dry converters (1.6MG). V.F. ' a) It contains two throat binding units, two generic low voltage plates and one generator (650 K). V.F. ' a) The number of emergency plates. Two transformer rooms containing 2 dry converters (1MB). V.F. ' a) It contains two throat binding units, two generic low voltage plates and one generator (500 K). V.F. ' a) the number of emergency plates. Third: medium and low voltage cable works. Excavation work and individual medium voltage aluminum cables armed with a total of 1100m were completed. i. Excavation work and low voltage aluminum cables armed with a total of 26132 m were completed. i. IV: Public Site Lighting Works. The Polard pole was installed at a height of 1 meter to light the university's walks with 300 poles. A total of 400 beams were installed to fire trees. Flood Light units have been installed to light the university's circular wall with a total of 30 alone. It was installed alone for the staircase with a total of 130 alone. Up & Down has been installed alone to light the walls and walls of the university with a total of 880 alone. A 6-metre-high street light pole has been installed, with a total of 200 poles. A 10-metre stadium light pole with 2 300W scouts with a total of 16 poles has been installed