First: The distributor building
8 medium voltage distributor buildings (22 kV) were constructed and contain 17 medium voltage cells to feed the project with five loops
Second: Transformer rooms
400 low voltage transformers were implemented containing oil transformers
(1 mega and 0.5 mega) and contain a ring connection unit and a low voltage panel
Third: Medium and low voltage cable works
Excavation and laying of medium voltage cables, reinforced aluminum, were completed with a total of 120,000 m.
Excavation and laying of low voltage cables, reinforced aluminum, were completed with a total of 70,000 m.
Fourth: Public site lighting and road lighting works
A lighting pole with a height of 9 meters was installed, single or double, to light the streets, with a total of 5,000 poles
A bollard was installed to light the public site and landscape, 600 poles